Laserfiche WebLink
PUBLIG WORKS PERMIT COA�MENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. � <br /> 1 <br /> /6. Connect side sewer per City StendarJ #'s ti01, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8� Connect rooftop downspouts to the drainage system provided fur t�iis Ict. <br /> 9. Rooftop runoff m�st be discharged ;u a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length _ <br /> 10. The contractor rtwst meet with the Public Works Inspector to discuss pot?ntial drainage <br /> routing prior to beginning the project. <br /> —� <br /> 11. Ihstall erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> ,=�1-2.�Install erosion control measures per City of Everett Standards for small parcele <br /> '13. Remove erosion controf ineasures upon completion of the project prior to final approval of the <br /> permit. <br /> � 14:�All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everelt Standard P!an �'s 305A <br /> & 306 on this preposal's frontage as direc�.ed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Instafl a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property Iine out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan n410 is <br /> required for the parking area. <br /> 20. If a sev��er pump system is to be installed, the pressure line must discharge into a private <br /> marhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> � � . , <br /> ��' � -� ,'�' i(,, -` /�' i_ �.' r. ,. <br /> i <br /> PNCamm;:nis' <br />