Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Fublic Works approved plan dated _ <br /> 5. Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect aIl rooftop downspouts to the side sewer. <br /> �� Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width_, Depth _, Length_. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to heginning the project. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for srr��ll parcels <br /> t�. Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> ��4.%411 excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per Ciry of Everett Standard Plan #'s 305A <br /> & 306 on this p;oposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> i 6. Install a Type I concrete driveway per City of Everett Standard if307. <br /> 17. Pave driveway from the front property line out to the street pavir�g. <br /> 18.;Contact the M a'/i f�E'� Water District for connecting provisions for this building's <br /> �— water and sewer services. <br /> 19. A catch basin as per City Standarc Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If e se�ver p��mp system is to oe installed, the pressure line must discharge into a private <br /> manhole, �;�ar� graviry flow �r,ross Che public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> PWCommenis _ �,• - <br /> � j', i � i . � �l�i; ��.'. < < : <br /> �.�. <br />