Laserfiche WebLink
PIJBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the sitle sewer. <br /> �Connect rooftop downspouts to the drainage system provided for this lot. <br /> C/ <br /> 9. Rooftop runoff must he discharged to a roof downspout �nfiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length _ <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> � <br /> � � Install erosion control measures as determined by the Public Works inspector, such as silt ' <br /> �� fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13- Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> .� 4. II excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No vdasting of material is al�owed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard ;307. <br /> 17. Pave driveway trom the front property line out to the street paving. <br /> 1� ontact the �'U.�1,: �{��� Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #h02 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharga into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> a�7comments <br /> I <br />