Laserfiche WebLink
. r <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Star�dard #601. <br /> 6. Connect side sPwer per City Standard #' S01, 6U2, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> �8. Connect rooftop do�vnspouts to the drainaoe system provided for this lot. <br /> 9. Rooftop runoff must be discharyed to a roof downspout infiltration systern per City of Fverett <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length_. <br /> 10. The contractor must meet with the Public Works Inspecior to discuss potential drainage <br /> routing prior to beginning the pr�ject. <br /> 11. stall erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, s��uales, or erosion blankets. <br /> 12. install erosion control measures per City of Everett Standards for smail parcels <br /> � 13. emove erosion control measures upon completion of the project prior to final approval of the <br /> � -`� permit. <br /> �14. II excavated material from foundation, sidewalk and driveways shail be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan n's 305A <br /> & 306 on this propcsal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard n307. <br /> 17. Pave driveway from the front property line out to th� •eet paving. <br /> � 1�Contact the f� k�i Ifi�O _ Water District for connecting provisions for this building's <br /> ��water and seNrer services. <br /> 19. A catch basin ao per City Standard Plan #402 with a gas trap per Standard Plan r410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprirkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> P�5'Commen�s Z/� <br />