Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Fublic Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> /� 8./Connect rooftop downspouts to the drainage system provided for this lot. <br /> v <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Mar�ual 3-2.6.2. Width _, Depth _, Length_. <br /> 10. The contractor must meet with the Public Work^ Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11 Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fen�e, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parceis <br /> 1�emove erosion control measures upon completion of ths project prior to final approval of the <br /> permit. <br /> 14. II excavated material from foundation, sidewaik and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan k's 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Instali a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the D� k��i('�< G VVater District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Pfan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system �s to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> , <br /> PV'Ccmments z�� <br />