Laserfiche WebLink
� ° <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. F,s per Public Works approved plan dated_ <br /> 5. Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> /8) Connect rooftop downspouts to the drainage system provided for this lot. <br /> �,, <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm tilanual 3-2.6.2. Width_, Depth _, Length_. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> � Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion con?rol measures per City ot Everett Standards for smail parcels <br /> �Remove erosion control measures upon completion of?he project prior to final approval of the <br /> permit. <br /> (14. II excavated material from foundation, sidewalk and driveways shall be ha�led to an <br /> �-� approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan n's 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unuaed <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the �"`�k: ��� Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system �s to be installed, the pressiire line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> P'lJCommen�s a/a <br /> � <br />