Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management Sysi �m <br />O5/15/1997 Page 2 <br />-------------------------------------------------------------------------------- <br />Date Range :O1/09/1989 - 05/15/1997 <br />CM Work Order Range :1001091070001 - 840108b700001Pattern :7101096750288 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />-------------------------------------------------------------------------------- <br />--------------------------------------------------------------------------------- <br />CM WORK ORDER ID: 7101096750288 (continued) <br />N/A <br />N/A <br />N/A <br />PIPE46304347 <br />PLUG44307747 <br />TEE046304047 <br />WYE044303947 <br />Vehicles: <br />ID <br />V0010 <br />V2112 <br />V2113 <br />V2152 <br />V2225 <br />V2230 <br />V2231 <br />V2663 <br />V3200 <br />V3603 <br />V6401 <br />V6807 <br />VH0002 <br />VJ0002 <br />VJ0004 <br />VJ0017 <br />VJ0019 <br />CSTC (ASSOC) <br />C.D.F. (ASSOC) <br />MAINT G FINE (WILDER) <br />PIPE 8" PVC SEWER <br />PLUG 6" (PVC) SEWER BELL END <br />TEE 8" X 6" ALI� GASKETED <br />WYE G" ALL GASKETED <br />Description <br />'92 GMC S10 PU <br />91 CHEV 1 TON <br />91 CHEV 1-TON <br />87 DODGE W/HOIST <br />88 FORD 8YD <br />91 FORD F800 DUMP 5 YARD <br />90 FORD DUMP 5-YARD <br />87 VACTOR <br />80 CASE VIBROMAX W25 ROLLER <br />86 CASE SACKIIOE 780 <br />80 CASE FLATBED TRAILER <br />89 COMPRESSOR IR <br />1993 VfiCTOR <br />93 INTERNRTIONAL 10 YD <br />'95 CHEV 1-TON <br />'96 FORD 5 YARD <br />�96 FORD 1 TON _ <br />Work Description: <br />----------------- <br />REPLACED 16' OF <br />LINE TO MANHOLE <br />2906 16TH ST. <br />04/24/1997 1 213.66 <br />04/25/1997 1 270.15 <br />04/30/199'' 7 63 02 <br />04/23/1997 16 34.56 <br />04/23/1997 1 1.98 <br />04/23/1997 1 14.46 <br />04/23/1997 1 10.48 <br />Total Material Cost: <br />Hours <br />6.00 <br />3.00 <br />4.00 <br />20.00 <br />3.00 <br />11.00 <br />8.00 <br />8.00 <br />3.00 <br />24.00 <br />3.00 <br />20.00 <br />4.50 <br />16.00 <br />10.00 <br />3.00 <br />3.00 <br />Total Vehicle Cost: <br />Cost <br />32.40 <br />15.93 <br />21.20 <br />96.00 <br />46.08 <br />118.80 <br />83.20 <br />381.60 <br />59.16 <br />95C.40 <br />0.00 <br />96.00 <br />233.55 <br />342.40 <br />59.00 <br />44.25 <br />17.70 <br />2597.67 <br />839.40 <br />��a I .s3 <br />�/�,` %,' <br />--------------------------------------------------------------- <br />8" MAIN. MAIN WAS BROKEN DOWN JUST EAST OF OLD REPAIR. TVED <br />T-16 LINE IN POOR SHAPE. RECONNECT TO SERIVE ADDRESS <br />Total cost for work order 7101096'750288: 5748.72 <br />