My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2920 16TH ST 2018-01-02 MF Import
>
Address Records
>
16TH ST
>
2920
>
2920 16TH ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 12:02:25 PM
Creation date
4/4/2017 2:32:18 PM
Metadata
Fields
Template:
Address Document
Street Name
16TH ST
Street Number
2920
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />08/12/1998 . Page 1 <br />Date Range :0'0/2�/1900 - 07/31/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern :7101196751490 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101190751490 Titlec CONVERT 2920 16TH ST <br />«DUPLICATE PRINTING OF THIS WORY. ORDER» <br />Item ID: WS1795T080 -- WATER SERVICE <br />LocaLion ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 07/15/1998 <br />Overall Craft: <br />Issued: 06/23/1998 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Labor: <br />Craft ID Name Planned Hrs Actual Hrs <br />------ ------------------------------ <br />----------- ----- <br />UL CSG CAVANAH, SHANE G. 0.00 3.00 <br />UL DMJ DOUCETTE, MARK J 0.00 3.00 <br />Materials: <br />ID <br />BOX000056247 <br />COUP34135447 <br />METE36089447 <br />SETT34146547 <br />Vehicles: <br />ID <br />'J2117 <br />Description <br />------------------------------ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" MIP X 1/2"CTSPJ@ <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />SETTER COP 5/8" X 3/4" (H9") <br />Description <br />91 CHEV 1-TON HYU UNIT <br />Total Labor Cost: <br />Date # Used <br />07/15/1998 1 <br />07/15/1998 2 <br />07/15/1998 1 <br />07/15/1998 1 <br />Total Material Cost: <br />Hours <br />3.00 <br />Cost <br />15.60 <br />Total Vehicle Cost: 15.60 <br />Work Description: <br />----------------------------------------------------- <br />METER #41909174 <br />8' LEFT OF RIGHT AND 21' OUT. <br />Cost <br />43.53 <br />48.60 <br />92.13 <br />Cost <br />12.94 <br />8.08 <br />30.67 <br />41.42 <br />93.11 <br />Total cost for work order 7101196751490: 20C.84 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.