Laserfiche WebLink
August 21, 1980 <br />Donald L. Berl:ey, P.E. <br />Chief DistriUution Engineer <br />Snohomish County P.U.D. <br />P.O. Box 1107 <br />Everett, WA J8206 <br />Subject: P.U.D. Permit ��780-18 � <br />W.O. N087731 �..._•= <br />Dear D1r. Berkey: <br />i��,�� ��.-���o':n <br />crtr or <br />evei-ett <br />CITY HI.LL � J59•O]]] <br />CVENCTT. W45111NLT011 <br />p0201 <br />Your application for a permit to install a portion of underground power system <br />within the public right-of-way 18th Ave. IV. lias been approved on August 27.,7.980 <br />as per plans. — —^ <br />The subject permit approval is based on the agreement that all work �aill. be <br />carried out in accordance with the City of Everett standards and American <br />Public i4orks Association specifications for trench excavation and Unckfilling <br />(Reference:Section 61, par. �.OS and 3.06). All hard surface street crossings <br />sliall be by jacking, boring or other preapproved construction methods. <br />It �aill be the obligation of the utility company to bear any costs that may be <br />incurred in testing and confirming the requirement. <br />The restoration of all landscaping and repairs will be comparable with its origi.r�al. <br />condition and to the satisfaction of the City Engineer or his appointed representative. <br />It will be your responsibility to contact the City Lngineering Department at 259-587] <br />immediately prior to starting cons,truction. <br />Sincerely, <br />I1UGH WARREN, P.E. <br />PuUlic iVorks Director/City Engineer <br />`��' ` ��--- <br />gy:Jeff Kerwin <br />Utility Inspector <br />I IN: JK: mh <br />�-_.-_.� <br />► <br />