Laserfiche WebLink
I'.nnii,n ri�ntml mauur�� �cill hr in.t:�lic�l tit thr ilirrciu�n �d uir ��uhli� ,.�n��., ni.�,rci��r in <br />aci�,nl;incc �� ith thc ('it� i�( li�crru I)��ien an�i ( un�trurti�,n tii,ui�lar�l,. I lii, �� ill mc�st <br />likcly consist ul �iltcr I:ibric Irncc� duwn slupc �d� li;l.. mck con.u�urliun cnu:inres. <br />scdimcnt u�,ips, hydrosccding and/or mulch. �1r.rv�l r���er ��n�l udimcnl u'ap�,. ��r uthcr, <br />�ippropri.uc for Ihc scason and sitc cnnditions at thc tnu� u(cuiuu'uciiun. <br />V. Analysis :md Design of Rcquircd Runol'I' Control 17'rcatmcnl and Strcaim IT��nI. <br />Grosion Control I3MPs <br />l�he dctention system is designed to detain devcloped runoff tu DOE su'cam hank erosion <br />control standards. TrcaMicnl will bc provided with a Storm Piltcr. m�uudacturcd by Storm <br />Wutcr Mantigemcnt, [nc. Dead slorage equal to 3U�/c� of the C-month, 24-hr developed event <br />is provided with two 72-inch catch basins and thc control structurc with spccifications for <br />the necessary amotmt of calch bclow the pipe inverts. <br />VL Analysis and Design of Kcyuired Sourcc Control [3�IPs <br />Source Control BMPs fbr the proposed site include a dcad storaee and detention system. <br />VII. Special Reporls .md Sludics <br />Not Applicable <br />VIII.Othcr Pcrmits <br />No other permits are required <br />IX. Nlisc. rorms and Workshcets <br />Plcusc scc tablc 1-2.1 for Scason.il Limitations <br />,l'. A�Iaintenance and Operatiuns Requirements <br />Mai�llenance of the detention facility includes unnual inspection of the catch basins and <br />pipes to determinc if scdiment is in necd of mmoval. Maintenance of dic storm tilter �vill l� <br />providcd in accordanee to the .ivached specifications from Stormwater Ivtanagement, Ine. <br />