My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9331 18TH AVE W SITE DEVELOPMENT 2018-01-02 MF Import
>
Address Records
>
18TH AVE W
>
9331
>
SITE DEVELOPMENT
>
9331 18TH AVE W SITE DEVELOPMENT 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 10:58:10 AM
Creation date
4/4/2017 3:24:59 PM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9331
Tenant Name
SITE DEVELOPMENT
Notes
SITE DEVELOPMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�, � � �,. <br />Thu, Dec 30, 2004 4:18 PM <br />Subject: 18th Ave West Estimate <br />Date: Thursday, December 30, 2004 3:52 PM <br />From: Joe Reidy <joer@stormwaterinc.com> <br />To: Ricky Ford <x-sound@whidbey.com> <br />Cc: Michael Macnoskey <michaelm@stormwaterinc.com> <br />Hi Ricky- <br />In accordance with your request for inFormation, we are pleased to submit the Following size <br />and cost estimate for the proposed stormwater treatment system for the 18[h Ave West project <br />in Everett, WA. <br />The Stormwater ManagemenC StormFilterp is a passive siphon-actuated, flow-through, <br />stormwater filtration system consisCing of a structure that houses rechargeable, media-filled <br />filCer cartridges. The StormFilter works by passing stormwater through the media-filled <br />carfridges, which trap particulates and adsorb pollutants sucfi as dissolved metals, nutrients, <br />and hydrocarbons. The drop from inlet to outlet required Chrough the StormFilter is 2.3'. <br />The design of the StormFilfer assumes that system maintenance will be performed at regular <br />intervals. Stormwater Management Inc. can be contracted to perform the maint?;�once or can <br />work directly with owners who wish to perForm their own maintenance. The estimated cost for <br />contracting maintenance with SMI is a[tached. Please contact us for more information about <br />maintenance options. <br />Ttie size and cost estimate is based on information provided by U_COUNTRY \*CHARFORMAT <br />"'>U2NDINVDT \*CHARFORMAT "'>UENGCOMP \*CHARFORMAT "'>X-Sound Engineering and is <br />not a formal quote. A formal quote can be provided once final plans have been provided. <br />Thank you for fhe opportunity to provide you with this information. If the SlormFilter seems <br />Iike an appropriate solution for your site, please email us or visit our website at <br />www.stormwaterinc.com <littp://www.sCormwaterinc.com/> to download AutoCAD drawings or PDF <br />files for inclusion on your plans. Please let us know if fhere is any additional information or <br />design support we can provide. <br />We look (orward to working with you on this project. <br />Thank you, <br />Joe Reidy <br />Project Designer <br />StormwaCer Management, Inc. <br />12021-8 NE Airport Way Portland, OR 97220 <br />T 800.548.4667 <br />F 800.561.1271 <br />www,stormwaferinc.com <http://www.s[ormwaterinc.com> <br />Come Rain, We Shine <br />This email is for the sole use of the intended recipient(s) and contains conFidential information <br />belonging to Stormwater Management, Inc. If you are not tlie intended recipient, any <br />disclosure, copying, distribution, or taking action on the contents oF this email is strictly <br />prohibited. If you received this email in error, please immediately notify the sender and (�,� <br />�J <br />Page 1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.