My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9339 18TH AVE W 2016-01-01 MF Import
>
Address Records
>
18TH AVE W
>
9339
>
9339 18TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2017 5:45:41 PM
Creation date
4/4/2017 3:25:50 PM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9339
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. <br />5. <br />6. <br />7. <br />PUBLIC WORKS PERMIT COMMENTS <br />As per Public Works approvec! plan dated <br />Connect side sewer per City Standard #601. <br />Connect side sewer per City Slandard #'s 601, E02. 604. <br />Connect all rooftop downspouts to the side sewer. <br />�`8.� Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discfiarged to a roof downspout infiltration system per City of Everetl <br />Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br />attachment for more details. <br />The contractor must meet with tYie Public Works inspector to discuss potential drainage <br />routing prior to beginning the project. <br />Install erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />Install erosion control measures per City of Everett S�andards for small parcels <br />Remove erosion cor;trol measures upon completion of the project prior to final approval of the <br />permit. <br />All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on th�s proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />17 <br />instail a Type i concrete driveway per City of Everett Standard #307. <br />Pave driveway from the iront property line out to the street paving. <br />18. Contact the Water District for connectin <br />water and sewer services. 9 Provisions for this building's <br />19. <br />20. <br />21 <br />A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />If � sewer pump system is to be installed, the pressure line must discharge in;o a private <br />manhole, then gravity flow across the public right-of-way. <br />A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Stan�ards 13D. <br />F'�.�ccmn,en� y/7� <br />/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.