Laserfiche WebLink
V. Analysis and llcsign of Reqaired Runoff Control (Trcutment and Stmam I3ank <br />F.rosion Control I3PdPs <br />The deten[ion systein is designed tc detain developed runoff to DOC strcam bank erosion <br />control standards. Treatment will be provided with dead storage eyual io the Gmonth, <br />24hour event under developed conciitions. Water quality will be a�idressed throu;h the <br />use of'de�d storage in a 36" diamecer pre-settling pipes, and the Stonn �ilter Manhole. <br />VI. Analysis and �c,�ign of Rr.yuired Sourcc Control BMPs <br />Source Conirol BA1Ps for the proposed site include a dead storage and d�_tention system. <br />VII. Special Rcpurts and Studics <br />Not Applicable <br />VIII.Othcr Pcrmits <br />No other permits are required <br />IX. Misc. Tc�rms and Worksheets <br />Please see table I-2.1 for Seasonal Limitations <br />Please see t�ble I-4.2 L�nd Use Activity Checklist <br />X. Maintenancc and Operations Itequirements <br />Maintenance of the detention facility includes lnnual inspection of die catch basins and <br />pipes to determine if sediment is in need of removal. Maintenance of the storm filter will <br />be provided in accordance to die attached specifications from Contech, Inc. <br />In addition, it should be noted that �er the City of Everett Stormwater Management <br />Manual, washing oP vehicles or equipment is prohibited on site. <br />