Laserfiche WebLink
PUBLIC WORKS PERMIT COMMF_NTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />�6.; Connect side sewer per City Standard �'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side >ewer. <br />8> Connect iooftop downspouts to the drainage sysiem provided for this lot. <br />� <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />11. Install erosion control measures as deterrnined by the Public Works inspector, such as silt <br />.� fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for small parcels <br />/ � <br />' 13. Remove erosion control measures upon completion of the project prior to final approval oi the <br />�i permit. <br />i 1:;P.II excavated material from foundation, sidewalk and driveways snall be hauled to an <br />approved, permitted site. No wasting of rnaterial is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Pl�n #'s 305A <br />& 306 on this pr000sal's frontage as directed by the Public Works Inspector (i.e. all unused <br />dr.veways and any broken or damaged area must be replaced). <br />i 6. Install a Type I concrete driveway per City of Everett Standard #307. <br />1 7. Pave driveway from the front property line out to the street paving. <br />18. Contact the <br />water and sewer services. <br />Water District for connecting provisions for this building's <br />19. A catch basin as per City Standa;d Plan �402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line mus: discharge into a private <br />manho!a, then gravity flow across the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />r"'Vr'C�mm[ni5 <br />