Laserfiche WebLink
PUBLIC WORKS PERMIT CC�MMENTS <br />4. As per Public V�lorks a�pro��ed plan dated <br />5. Connect side sewer per City Standard #601. <br />6. Conn�ct side sewer per Ciry Standard #'s 601, 60?_, 604. <br />7. Connect all rooftop downspoi.its to the side sewer. <br />�� 8, -�Gonnect rooftop downspouts to the drainage system provided for this lot. <br />9. Rcoftop runoif must be discharged to a roof downspout infiltration system per City of Evereit <br />Storm Manual 3-2.6.2. Widch _, Depth _, Length _ <br />10. The contractor must meet witti the Public \Norks Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />1� Install erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />12. install erosion control meas�res per City of Everett Standards for sm�ll parcels <br />� 13� Remove erosion control measures upon completion of the project prior to final approval of the <br />�� permit. <br />14;; II excavated material from foundation, sidewalk and driveways shall be hauled to an <br />_� approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Rem�ve and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Ins:�ll a Type I concrete driveway per City of Everett S'tandard #307. <br />17. Pave driveway from the front property line out to the street paving. <br />8 Contact the !^ �+� i''" ' Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catcfi basin as per City Staridard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system �s to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />a;vcc�r.^�enis <br />�L� <br />