My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/06/17 Council Minutes
>
Council Minutes
>
2015/06/17 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:55:56 PM
Creation date
7/2/2015 11:17:10 AM
Metadata
Fields
Template:
Council Minutes
Date
6/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 17, 2015 <br />soil sampling and analysis along the proposed excavation for the <br />tidal channel in the amount of $30,000.00. <br />Roll was called with all council members voting yes. <br />Motion carried. <br />AGREEMENT — THREE LAKES VALVE BYPASS — PHASE 1 <br />Moved by Council Member Tuohy, seconded by Council Member <br />Murphy, to authorize the Mayor to sign a Professional Services <br />Agreement with HDR Engineering, Inc. to provide engineering and <br />construction management services for the Three Lakes Valve <br />Bypass Project — Phase 1 in the amount of $44,580.00. <br />Roll was called with all council members voting yes. <br />Motion carried. <br />AGREEMENT AMENDED — 2014 COMPREHENSIVE SEWER PLAN <br />Moved by Council Member Murphy, seconded by Council Member <br />Tuohy, to authorize the Mayor to sign Supplemental Agreement No. 4 <br />to the Professional Services Agreement with HDR Engineering, Inc. <br />to extend the time of completion for the 2014 Comprehensive Sewer <br />Plan to December 31, 2015, at no additional cost. <br />Roll was called with all council members voting yes. <br />Motion carried. <br />182 <br />
The URL can be used to link to this page
Your browser does not support the video tag.