Laserfiche WebLink
� <br />CITY OF EVERETT <br />Utilities Division <br />MATERIALS USED ON PROJECT <br />., <br />W.O. No._���7 <br />SIZE/ UNIT TOl"AL SIZE/ UNIT TOTAL <br />QN UNIT 61ATEFi�ALS COST COST QTY UNIT MATERIALS COST COST <br />I <br />Sub Total Material Cost 5 <br />Total Material Cost S <br />LABOR AND EQU�PMENT ON PROJECT <br />A N• • • � ��� • � ��� <br />►.f►�/�__- -- <br />/��� =� �_- <br />_ <br />_- __- <br />__- __- <br />__ __- <br />CC� CC� <br />��� ��� <br />Date Work Completed: <br />Signalure of Foreman <br />Sub Total Labor Cost S <br />Total Labor Cosl 5 <br />Sub Total Rental Cost $ <br />Total Rental Cost 5 <br />Total Charges, Malerials, Labor and Rentals 5 <br />