Laserfiche WebLink
4. <br />� <br />PUBLIC WORKS PERMIT <br />� <br />� �' �z ���-' � <br />���� <br />COMMENTS <br />As per Public Works approved plan dated _ <br />Connect side sewer per City Standard #601. <br />7. Connect all rooftop downspouts to the side sewer. <br />10. <br />/ t�/��= T�U <br />Ed�ft7rthis tot'— r�cr �l/�l.!�i3�r <br />Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everet! <br />�torm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25� long. See <br />attachment for more details. Z Z� <br />The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />11.� Install erosion contrcl measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for smalf parcels <br />14. <br />Remove erosion cor,trol measures upon completion of the project prior to final approval of the <br />permit. <br />All excavated material from foundation, sidewalk and driveways shall be hauled lo an <br />approved, permitted site. No wasting of material is allowed on this buiiding lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type i concrete driveway per City of Everett Standard #307. <br />17. Pave driveway from the fronr property line out to the street paving. <br />� Contact the!/��/�/L,TEO Water District for connecting provisions for this building's <br />water and sewer services. <br />19 <br />20. <br />21 <br />A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan �410 is <br />required for the parking area. <br />If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />PWComm^a� <br />