Laserfiche WebLink
PUBL�C WORKS PERMIT COMMEIVTS <br />4. As par Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />6. Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connec:t all rooftop downspouts to the side sewer. <br />� Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss poteniial drainage <br />routing prior to beginning the project. <br />1 i. Install erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />12 Install erosion control measures per City of Everett Standards tor smaii parcels <br />� <br />13. emo�ie erosion control measures upon cornpletion of the project pricr to final approval of the <br />permit. <br />C�AII excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of �verett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector ii.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard n307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. ontact the �'�kKi ��i�v Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan k402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />P','JComments � / �� � � �-�1 l�—�/-� �--� L��� <br />( <br />