Laserfiche WebLink
ANGHOR BOLTS <br />ANGHOR BOLTS 5}iALL BE GALVANIZED TRUBOLT WEDGE ANGHpRS BY ITW <br />RAMSET/RED H�AD. R�STALLATION SHA�L BE IN STRIGT AGGORPANGE WITH IGG <br />EV,�LUATION REPORT N�. ER-13"i2. <br />SPEGIALINSPEGTION <br />THE FOLLOWING ITEMS REC�iJIRf_= SPEGIAL INSPEGTION PER IBG SEGTION 1iO4. THESE <br />INSPEGTIONS SHALL BE PERFC�RNfED BY A SPEGIAL INSPEGTOR GERTIFIED BY <br />WABO TD PERFORM THE TYPF-S OF INSPEGTION SPEUFIED. <br />PILES <br />V`IELDING <br />.�►� Yourog, P,S, <br />Structu�al Fngineers <br />�OUNDATION REPAIR <br />REGOMMENDATI ON5 <br />PAGI�IG WEST <br />GONDOMINIUMS <br />�VERETT, WA <br />� <br />p�v�L� DATE: 5/13/05 <br />ap �+s,,, yo RE�li510N: O <br />~coG'Z JGB NO.: 11�18.02 <br />� z � <br />' BY: JLY <br />�,:� �, ,� DRAWING NO. <br />SHEET 6 <br />C �'� <br />