My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12610 18TH DR SE 2016-01-01 MF Import
>
Address Records
>
18TH DR SE
>
12610
>
12610 18TH DR SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 10:20:39 PM
Creation date
4/4/2017 3:46:57 PM
Metadata
Fields
Template:
Address Document
Street Name
18TH DR SE
Street Number
12610
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUE3LIC NORKS PERMlT COMMENTS <br />Ccnnect side sewer per Ciry Ste idard #b01. <br />Connect side sewer per City SIa idard #'s 601, 602, 60A. <br />Connect all rnoflop downspouts to the side sewer. <br />Connect rooftop downspouts to the drainage system provided for tnis l01 <br />Rooftop runoff must be discharged to a roof dowrspout infiltration system per City of Everett Slor � <br />Manual 3-2.62. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachrr�ent for <br />more details. <br />9. The contractor must meet with the Public Works Inspector lo discuss potential drainage routing prior to <br />beginning the project. Call Randv Allen at 425-339-7403 // Call Cliff Lindman at 425-339-7404. <br />�� <br />10. Install erosion control measures as determined by ihe Public Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankets. <br />11. Install erosion control measures per City of Everett Standards for small parels <br />12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />All excavated material from foundation, sidewalk and drivea�ays shall be hauled to an approved, permitted <br />site. No wasting of material is allowed on lhis building lot. <br />No dirt, mud, rocks or debris to be tracked onto roadway. <br />No buiiding materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kepi ctean and <br />open for pedestrian travel. <br />Adjust water meter box 1" above side�oalk grade. <br />17. Remove and replace curb, gutter and sidewalk as per City of Everett Stendard Plan #'s 305A & 306 on <br />ihis proposal's frontage as directed by ihe Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />18. Install a Type I concrete driveway per City of Everett Standard #307. <br />` U (� �1 <br />1 j Pave driveway from th"e�¢oniRrope\y line�o`t to•th�e str��t.paYing` <br />20. <br />21 <br />Pave to existing paving in alley. <br />Contact ihe Water District for conneciing provisions for this building's water and <br />sewer services. <br />22. A catch basin as per City Standard PI� �#402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />23. <br />24. <br />If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br />gravity flow across tlie public right-of-way. <br />A sprinkler system is required for this building in compliance with the requirements of NFPA Slandards <br />13D. <br />Your Public Works Inspector is Cliff Lindman. Call him �t 425-339-7404 for questions and inspections <br />PWCommenis 1 Revised 6'8111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.