Laserfiche WebLink
PUBLIC WORK.S PERMIT COYIMENTS <br />Connect side sewer per City Standard #&01. <br />Connect side sewer per Cily Standard #'s 601, 602, 60a. <br />Connect all rooftop downspouts to the side sewer. <br />Connect rooftop dovmspouts to ihe drainage system provided for this lot. <br />Rooftop runoff must be discharged to a roof downspout infltration system per City uf Everett Storm <br />Manual 3-2.62. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br />r�ore details. <br />9. The co:riractor must meet with the Public Works Inspector to discuss polenlial drainage routing prior to <br />begirr.ing the project. Call Randv Allen at 425339-7403 // Call Cliff Lindman at 425-339-7404. <br />�� <br />10. Inslall erosion control measures as delermined by the Public Works insoector, such as si�t fence, straw <br />bales, swales, or erosion blankets. <br />11 <br />12. <br />i � 73 <br />Install erosion conirol measures per City of Everett Standards for small parcels <br />Remove erosion control measures upon �ompletion of the project prior to final approval of the permit. <br />All excavated material from foundation, sidewalk and driveways shall be hauled co an approved, permifted <br />site. No wasting of material is allowed on this building iot. <br />/ 14 No dirt, mud, rocks or debris to be tracked onlo roadway <br />.-�'1 <br />�15� No building materials to be stacked on sidewalk/roadway and sidewalk/road�:�ay to be kept ctean and <br />` open for pedestrian travel. <br />� 16. � Adjust water meter box 1" above sidewalk grade. <br />17. Remove and replace curb. gutter and sidewalk as per City of Everett Standa;d Plan #'s 305A & 30B on <br />this proposal's frontage as directed by lhe Public lNorks Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />18. Install a Type I concrete driveway per City of Everett Standard #307. <br />� <br />79; � Pave drivewa� ne ou ie , eT�.,. <br />20. Pave to existing paving in alley. <br />21. Contact �he Water District for connecting provisions for lhis building's water ard <br />sewer services. <br />22. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan �t410 is required for the <br />parking area. <br />23. <br />24. <br />If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br />gravity flow across the pubiic right-of-way. <br />A sprinkler system is required for this building in compliance with ihe requirements of N:'PA Standards <br />13D. <br />Your Public Works Inspector is Cliff Lindman. Call him at 425-339-7404 for Guestions and inspections <br />PWComments! RevisM E�9111 <br />