Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 3/16/2017 8:27 <br /> Issued By HLJ HUSBY, LANCE J. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 11/30/2016 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 11 3 <br /> Title CONVERT.75 INCH 1711 52ND ST SE UT3473-11-3 <br /> Work Order No 20162697 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 11/30/2016 Time 14:28 Original WO Billing <br /> Problem Details <br /> CONVERT.75 INCH CURSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS3295W012 WASRVC YES 12/28/2016 <br /> Address 1711 52ND ST SE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 1711 52nd ST S.E. <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000647 ADAPTER 3/4 FIP X 3/4 IPS INSTA-TITE 2 31.01 01/03/2017 PAI` <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 2 31.864 01/03/2017 PAI• <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 71.275 01/03/2017 PAI' <br /> M COUP34142747 COUPLING 3/4 CTS COMPRESSION X 3/4 MIP .871-.879 2 22.886 01/03/2017 PAI` <br /> M ELL034104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 2 9.98 01/03/2017 PAI• <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 190.362 01/03/2017 PAI' <br /> M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 2 .632 01/03/2017 PAI' <br /> M SETT34149747 SETTER COPPER 5/8 X 3/4 HEIGHT 7" NO LEG LENGTH VINO 1 103.544 01/03/2017 PAP <br /> Total Material Cost $461.55 <br /> Total Cost $461.55 <br />