My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/02/18 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/02/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 9:35:26 AM
Creation date
4/5/2017 9:35:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/18/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{s • i 1CVJEFAft cffreeJW 11,,vJJIfNif[mm�.vi c \o\yGl2 vt,irri ti r ; <br /> PROJECT TITLE: Consent COUNCIL BILL# <br /> Replacement of Transmission X Action Originating Department Public Works <br /> Lines 2&3, Phase 6 First Reading Contact Person Souheil Nasr <br /> Construction Change Order Second Reading Phone Number 257-7210 <br /> No. 1 Third Reading FOR AGENDA OF Feb. 18,2009 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> South side of HWY 2 Contract Award 4/30/08 Change Order No. 1 <br /> between Snohomish Budget Comm. 1/14/09 <br /> River&Ebey Slough <br /> Amount Budgeted $26,000,000. <br /> Expenditure Required $341,500 Account Number(s): UP3141 <br /> Budget Remaining 500,000 <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> Snohomish County is widening Lake Stevens Road at 20th Street SE across the City's Transmission Line#2. <br /> Since this line is scheduled to be replaced soon,the City wants to replace 240 feet of 48"pipeline at this time <br /> prior to the new road widening and surfacing. <br /> This would reduce the impact on the surrounding community and will eliminate the need to tear up and repair <br /> a new roadway. This work can be accomplished prior to the County road construction by approving a change <br /> order for$341,500 to our present contract with Tri-State Construction,Inc for the Replacement of <br /> Transmission Lines 2& 3,Phase 6 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order No. 1 with Tri State Construction for the replacement of <br /> Transmission Lines 2&3,Phase 6 in the amount of$341,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.