My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/02/18 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/02/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 9:35:26 AM
Creation date
4/5/2017 9:35:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/18/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.1001- Project: Replacement of Water Transmission <br /> Lines 2 and 3 Phase 6 Project. <br /> Change Order No.1 <br /> Change Order Effective Date: January 8, 2009 <br /> CONTRACTOR <br /> By Date: °‘/' ��• <br /> Officer <br /> Exhibit A—Description of Changed Work: <br /> New Bid Item <br /> Item#55 Installation of 240 LF of 48" Steel Waterline. Create a new bid item entitled,"Installation <br /> of 240 LF of 48" Steel Waterline", at the lump sum price of$341,500.00.Attached Drawings labeled <br /> Replacement of Water Transmission Line 2—Phase 6A includes all work that will be performed for <br /> the mentioned Lump sum price. <br /> Therefore the overall net result of added bid item results in a 341,500.00 increase to the contract. <br /> This results in a cost increase to the contract. <br /> Exhibit B—Justification: <br /> New Bid Items <br /> Item#55-Installation of 240 LF of 48" Steel Waterline.This bid item is being created to pay for <br /> additional work for the Replacement of Water Transmission Line 2—Phase 6A. Snohomish County is <br /> widening 20th Street S.E. and the City.of Everett's TL#2 is scheduled to be replaced at a later date. <br /> The installation of this 240 LF of water transmission line will reduce the impact to the surrounding <br /> community and will eliminate the need to tear-up and repave a newly improved intersection by <br /> installing the 240 LF now. <br /> Exhibit C—Additional Contract Time <br /> There will be no additional working days added as a result of this change order. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.