My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/02/25 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/02/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 9:40:29 AM
Creation date
4/5/2017 9:40:17 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/25/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK r- <br /> v <br /> 1. Work to Be Performed <br /> Description of Project: Add dedicated cooling system to serve 280 Square Foot <br /> Back-Up Data Center located in the City of Everett's South Precinct Emergency <br /> Operations Center. <br /> Scope of Services: RICE Group, Inc. shall provide Mechanical and Electrical <br /> Design services as follows: <br /> 1. Site visit(s) as required to document existing conditions. <br /> 2. Select Cooling Equipment. <br /> 3. Provide Mechanical Construction Drawings. <br /> 4. Provide Electrical Construction Drawings. <br /> 5. Division 15 Specifications. <br /> 6. Division 16 Specifications. <br /> 7. Mechanical and Electrical Cost Estimate. <br /> 8. Attend Pre-Bid Contractor Meeting. <br /> 9. Review Shop Drawings/Submittals <br /> 10. Respond to RFIs During Construction. <br /> 11. Complete (1) One Site Visit at 100% Complete with Punch List. <br /> Exclusions: Structural Engineering, Architectural Services, Specifications other <br /> than Division 15 and 16. <br /> Page 10 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.