My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/03/04 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/03/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 9:46:08 AM
Creation date
4/5/2017 9:45:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/4/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Consent COUNCIL BILL# <br /> Amendment No. 2 to X Action Originating Department Engineering <br /> Professional Services First Reading Contact Person Ryan Sass <br /> Agreement with TranTech Second Reading Phone Number (425) 257-8942 <br /> Engineering, LLC, to perform Third Reading FOR AGENDA OF March 4,2009 <br /> the 2008 bridge inspections for Public Hearing <br /> the City of Everett. Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Smith Island bridges 2/25/09 Budget Amendment No. 2 Legal, Utilities <br /> (3) and Riverside Committee <br /> Development bridge. 12/22/08 Council <br /> Authorized <br /> Amendment No. 1 <br /> Amount Budgeted $209,873.00 <br /> Expenditure Required $261,581.00 Account Number(s): PW3340 <br /> Budget Remaining - 0 - <br /> Additional Required $51,708.00 <br /> DETAILED SUMMARY STATEMENT: <br /> The overall objective of the 2008 bridge inspections is to maintain public safety, determine maintenance <br /> requirements, and provide documentation,which will satisfy current WSDOT and FHWA standards. <br /> Additionally, these inspections will provide an effective basis for the City to evaluate the existing <br /> condition and load rating of the structures, and to identify any needed repairs. <br /> This amendment includes additional tasks to include load rating calculations and provide the associated <br /> report for three bridges on Smith Island and the Riverside Development bridge. <br /> The funding sources for Amendment No. 2 are: <br /> Fund 024 -Engineering/Public Services $17,617.00 <br /> Fund 401 -Utilities $34,091.00 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 2 to Professional Services Agreement with TranTech <br /> Engineering, LLC, to perform the 2008 bridge inspections for the City of Everett for an additional amount <br /> of$51,708.00. <br /> PW3340 TransTech Amend No 2 CCA_revised.doc 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.