My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/03/25 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/03/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 11:28:03 AM
Creation date
4/5/2017 11:26:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/25/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br /> Comprehensive Plan/Shoreline Master Program Vision Statements <br /> The purpose of the project is redevelopment of the site consistent with the following <br /> Comprehensive Plan and Shoreline Master Program vision statements: <br /> Lands located along the Snohomish River south of the SR 2 bridge and north of 36th St. <br /> This area shall be developed with high quality mixed-use development including multiple family <br /> residential, office park, light commercial and high quality public access on the site. <br /> Tire Fire/Landfill Site <br /> The Tire Fire/Landfill Site shall be developed as a high quality, master planned"lifestyle <br /> entertainment center". The master plan shall encourage public enjoyment of the river and <br /> shorelines and emphasize an attractive,people oriented mixed-use commercial center with <br /> significant public access, abundant parking, a plaza or public center area, and separation between <br /> pedestrians and automobiles encouraging pedestrian movement. The master plan shall orient <br /> buildings and facilities to maximize visual access to the river, estuary and mountain views and <br /> provide visual and direct access to the river and prominent riverfront trails. Examples from <br /> which to draw design and land use concepts include but are not limited to: Granville Island and <br /> Nanaimo in British Columbia, Portland's Riverfront, Pickering Farms in Issaquah, and Carillon <br /> Point in Kirkland. However,the design master plan should be tailored to Everett's needs and <br /> overall vision for the riverfront. The mixed uses may include commercial/retail, office, <br /> multifamily residential,public access to the shoreline, and ample trails and walkways. <br /> Developable Portion of Simpson Site <br /> The vision for the 45-acre"development pad"on the 136-acre Simpson site is an attractive, <br /> master planned campus-like office park or high quality mixed use office/residential development. <br /> A possible use for this site could be the headquarters for a high quality high tech company. The <br /> remainder of the Simpson site will be for conservation and park purposes except for <br /> transportation and utility access. The riparian corridor along the river will be preserved with <br /> public access including a trail. The southern portion of the site should be open space and park <br /> use. <br /> Simpson Category 1 Wetlands and Riparian Corridor <br /> The Category 1 wetlands and the riparian corridor on the Simpson site will be for conservation, <br /> except for transportation and utility access. The riparian corridor along the river will be <br /> preserved with public access including a trail. <br /> South Simpson Site <br /> The Category 3 wetlands on the Simpson site will be for conservation and park purposes, except <br /> for transportation and utility access. The southern portion of the site should be open space and <br /> park use. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.