Laserfiche WebLink
' E RF;TT"CITY COT ITEM COZIER S T 4 <br /> I1'..� T • u t - ,a ,...! .. _ <br /> Fl <br /> PROJECT TITLE: Consent COUNCIL BILL# <br /> Professional Services Agreement X Action Originating Department Facilities <br /> with Northwest Corrosion First Reading Contact Person Chris Lark <br /> Engineering for corrosion control Second Reading Phone Number 425-257-8897 <br /> systems for underground fuel Third Reading FOR AGENDA OF April 1, 2009 <br /> storage tanks at Fire Stations No. Public Hearing <br /> 1,4 & 6 in the amount of Initialed by: <br /> $10,316.00 Department Head _J <br /> CAA <br /> Council President l <br /> Location Preceding Action Attachments Department(s)Approval <br /> Fire Station No. 1,4 &6 None PSA Fire Department <br /> Amount Budgeted $10,316.00 <br /> Expenditure Required $10,316.00 Account Number(s): <br /> Budget Remaining $0.00 Facilities Repair&Maintenance Budget <br /> Additional Required $0.00 FA4100, FA4400, FA4600 <br /> DETAILED SUMMARY STATEMENT: <br /> Fire Stations No. 1, 4 & 6 have underground fuel storage tanks which need routine maintenance of their <br /> corrosion control systems in order to stay in compliance with State DOE and Federal EPA requirements. <br /> Facilities have selected Northwest Corrosion Engineering to provide design services for the corrosion control <br /> systems due to their expertise in field. A breakdown of cost is as follows: <br /> Construction Documents: $ 9,480.00 <br /> Construction Administration: $ 260.00 <br /> Laboratory Soils Analysis: $ 225.00 <br /> Reimbursable Expenses: $ 315.00 <br /> TOTAL $10,316.00 <br /> The cost of this work will be funded by the Facilities Repair&Maintenance Fund. <br /> RECOlVIlVIENDATION: <br /> Authorize the Mayor to sign a Professional Services Agreement with Northwest Corrosion Engineering <br /> for corrosion control systems for underground fuel storage tanks at Fire Station No. 1, 4 & 6 in the <br /> amount of$10,316.00 <br />