My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/04/01 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/04/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 8:40:05 AM
Creation date
4/7/2017 8:39:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/1/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 EXHIBIT A <br /> SCOPE OF WORK <br /> Work to Be Performed <br /> 1. Review facility documents, including drawings, installation data, operational records, and <br /> existing system components. <br /> 2. Conduct on-site testing to determine protective current requirements, environmental <br /> conditions, locations of foreign below ground structures, and locations on anode groundbeds. <br /> 3. Provide an engineered corrosion control system design, (specifications and drawings), for the <br /> metallic tanks and piping systems located at Fire Station # 1 (3619 Rucker Avenue), Fire <br /> Station # 4 (5920 Glenwood Avenue), and Fire Station # 6 (9520 Evergreen Way). The <br /> designs will be in accordance with Washington State Department of Ecology requirements <br /> and methodologies outlined by the National Association of Corrosion Engineers <br /> recommended practice RP0285 Corrosion Control of Underground Fuel Storage Tanks. <br /> Incorporate documents into City of Everett work package for bidding purposes. Review bid <br /> package and provide comments to City personnel. <br /> 4. Assist City with bidder questions and development of project addenda. <br /> 5. Review of contractor bids, submittals, and qualifications. <br /> 6. Project management and on-site inspection of Contractor installation. <br /> 7. Review of Contractor final documents including system commissioning data, as-built <br /> drawings and DOE/EPA paperwork. Develop cathodic protection system monitoring program <br /> for the City. <br /> Page 11 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.