My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/04/15 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/04/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 8:52:11 AM
Creation date
4/7/2017 8:51:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: X Consent COUNCIL BILL# <br /> Call for Bids for the Action Originating Department Public Works <br /> Construction of the Larimer First Reading Contact Person Carl Baird <br /> Road at Wood Creek Project— Second Reading Phone Number 425-257-8852 <br /> Sheet Pile and Grout Repairs Third Reading FOR AGENDA OF April 15, 2009 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President YJP�P <br /> Location Preceding Action Attachments Department(s)Approval <br /> Larimer Road at Wood Bud. Comm., 02/14/07 Public Works/Utilities <br /> Creek culvert crossing PSA, 02/28/07 <br /> (S.E. Everett) Amend.No. 1, 12/26/07 <br /> Bud. Comm., 12/10/08 <br /> Amend. No. 2, 12/17/08 <br /> Amount Budgeted $360,000 <br /> Expenditure Required $2,000 Account Number(s): UP 3266 <br /> Budget Remaining $250,800 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> Geotechnical investigation has revealed loose/soft soils underneath Larimer Road at the Wood Creek culvert <br /> crossing. In order to protect the roadway and City utilities (including the City's South End Sewer <br /> Interceptor) from potentially washing out,the poor soils need to be stabilized and the upstream face of the <br /> roadway needs to be protected. <br /> In February 2007, the City contracted with GeoEngineers, Inc. to provide the required design engineering <br /> services for repairs to Larimer Road at Wood Creek. Improvements will include a sheet pile retaining wall <br /> and grout injections around the Larimer Road culvert crossing for Wood Creek. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize to Call for Bids for the construction of the Larimer Road at Wood Creek Project—Sheet Pile and <br /> Grout Repairs <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.