My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/04/15 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/04/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 8:52:11 AM
Creation date
4/7/2017 8:51:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s•, '"mow. v,av:•'1�� "" t•c$N. � -'ti .+'+: r .w'` ,.. ss i <br /> e {.• �5 ' `•'.''i � asp <br /> 6+rf�' .'<s'�, ��• w:: r z k' ��' -2 �� r � <br /> , ?sF<S�`";.., t°S✓ �n' <br /> PROJECT TITLE: J <br /> X Consent COUNCIL BILL# <br /> Authorize the call for bids Action Originating Department ENG/PS �,�t, <br /> for the Holly Drive Non- First Reading Contact Person Ryan Sass,P.E.i`'`' <br /> Motorized Improvement Second Reading Phone Number 425-257-8942 <br /> Project. Third Reading FOR AGENDA OF April 15, 2009 <br /> Public Hearing <br /> Initialed by: <br /> Department Head ,, <br /> CAA / V' <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Vicinity Map Utilities, Streets <br /> Amount Budgeted $ 830,239.00 Est. <br /> Expenditure Required Account Number(s): PW3254 <br /> Budget Remaining <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> The construction plans and specifications are complete and the project is ready to be advertised <br /> for construction bids. This project will construct curbs, gutters, sidewalks, bike lanes and storm <br /> drainage improvements on Holly Drive from 92nd Street to 4th Avenue W. These improvements will <br /> enhance safety and mobility for non-motorized traffic in this corridor, as well as complete the <br /> missing link in the Holly Drive corridor. <br /> The source of funds for this project is: <br /> CMAQ (Federal) $427,228.00 <br /> ARRA (Federal Economic Stimulus) 332,011.00 <br /> Fund 119 (Arterial Streets) 71,000.00 <br /> Total $830,239.00 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the call for bids for the Holly Drive Non-Motorized Improvement Project, <br /> W03254-Bid Call CCA.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.