My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/05/20 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/05/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 9:37:31 AM
Creation date
4/7/2017 9:37:17 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/20/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> .... t..,;. ;..,... <br /> PROJECT TITLE: Consent COUNCIL BILL# <br /> X Action Originating Department Engineering <br /> Award of construction contract First Reading Contact Person Dave Davis, PE <br /> for Riverfront Surcharge Phase Second Reading Phone Number 425-257-8913 <br /> 2 Project to KLB Construction Third Reading FOR AGENDA OF May 20, 2009 <br /> of Mukilteo, WA, in the Public Hearing <br /> amount of$1,816,434.98. Initialed by: <br /> Department Head <br /> CAA <br /> Council President. <br /> Location Preceding Action Attachments Department(s)Approval <br /> Riverfront Site 4/1/09 Call for bids Bid summary Utilities, Streets <br /> authorized <br /> Amount Budgeted $3,897,981.36 <br /> Expenditure Required $1,816,434.98 Account Number(s): Fund 402 <br /> Budget Remaining $2,081,546.38 <br /> Additional Required - 0 - <br /> DETAILED SUMMARY STATEMENT: <br /> Bids were opened on May 5, 2009, for the Everett Riverfront Surcharge Phase 2 project. There were 11 <br /> bidders with a bid range from a low bid of$1,816,434.98 to a high bid of$2,757,283.62. The lowest <br /> responsive and responsible bid was submitted by KLB Construction, Inc. The apparent low bid,submitted <br /> by JR Hayes & Sons, contained a$250,000 math error, which, after correction, moved them to 5th place on <br /> the bid summary. We recommend that KLB Construction, Inc. be awarded the Construction Contract for the <br /> Everett Riverfront Surcharge Phase 2 project in the amount of$1,816,434.98. <br /> This phase includes the demolition of the Animal Shelter, removal of excess soil from phase 1 areas, and <br /> placement of fill and surchargeon phase 2 areas. This work is scheduled to occur during the dry summer <br /> months. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize award of construction contract for Riverfront Surcharge Phase 2 Project to KLB Construction of <br /> Mukilteo, WA, in the amount of$1,816,434.98. <br /> Surcharge Ph 2 Award CCADOC 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.