My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/05/27 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/05/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 9:52:53 AM
Creation date
4/7/2017 9:52:06 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/27/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVgRET O-18W CIL AGENDA•ITEM CO.ft$I- ET <br /> PROJECT TITLE: 6 <br /> Consent COUNCIL BILL# <br /> Final Acceptance and X Action Originating Department Public Works <br /> Certification of Completion First Reading Contact Person Tom Fuchs <br /> with KLB Construction for the Second Reading Phone Number 425-257-8931 <br /> Combined Sewer Replacement Third Reading FOR AGENDA OF May 27,2009 <br /> "I" and Water Replacement"J" <br /> Public Hearing <br /> Project <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President C4-= <br /> Location Preceding Action Attachments Department(s)Approval <br /> Various streets in the Bid: 6/26/2007 Final Contract Voucher Public Works <br /> City of Everett. Award: 7/18/2007 Certification, Certificate <br /> Budget Committee of Completion,Final <br /> CO#1: 4/23/2008 Estimate <br /> City Council: 4/30/2009 <br /> Amount Budgeted $ 3,700,000.00 <br /> Expenditure Required $ 0 Account Number(s): UP3263 &UP3264 <br /> Budget Remaining $235,824.17 <br /> Additional Required $ 0 <br /> DETAILED SUMMARY STATEMENT: <br /> The general contractor,KLB Construction, completed the Sewer System Replacement"I" and Water <br /> Replacement"J"project in accordance with the plans and specifications and to the satisfaction of the Public <br /> Works Department. <br /> The amounts paid the contractor under this contract are as follows: <br /> Amount paid to date is $3,464,175.83. The contractor put up a Retainage Bond in Lieu of retainage being <br /> withheld. <br /> By Council approving this action,the Sewer System Replacement"I", Water Replacement"J"project will be <br /> accepted as complete and the retainage bond will be released. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Accept Sewer System Replacement"I" and Water replacement"J"Project as complete and authorize the <br /> Mayor to sign the Certificate of Completion with KLB Construction allowing release of the retainage bond. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.