My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/06/03 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/06/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 10:27:10 AM
Creation date
4/7/2017 10:26:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/3/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> 2 <br /> X Consent COUNCIL BILL# <br /> Authorize the call for bids for Action Originating Department ENG/PS <br /> the Snohomish Riverfront Trail First Reading Contact Person /�� Ryan Sass, P.E. <br /> (Phase II) and the 36th Street Second Reading Phone Number 425-257-8942 <br /> Railroad Crossing Closure Third Reading FOR AGENDA OF June 3, 2009 <br /> improvement projects. Public Hearing <br /> Initialed by: • <br /> Department Head , <br /> CAA 4B Apo <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Smith Ave. and 36th Utilities, Streets <br /> Street <br /> Amount Budgeted $ 824,800.00 Est. <br /> Expenditure Required Account Number(s): PW2598, PW3036 <br /> Budget Remaining <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> The construction plans and specifications are complete and the project is ready to be advertised for <br /> construction bids. This project will construct curbs, gutters, sidewalks, bike lanes and storm drainage <br /> improvements on Smith Avenue from 41st Street to the Multimodal Station and complete the 36th Street <br /> railroad crossing closure. These improvements will enhance safety and mobility for non-motorized traffic in <br /> this corridor, as well as complete a missing link in the trail system. <br /> The source of funds for this project is: <br /> STPE (Federal Grant) $300,800.00 <br /> STPXP (Federal Grant) 42,500.00 <br /> Fund 119 (Arterial Streets) 481,500.00 <br /> Total $824,800.00 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the call for bids for the Snohomish Riverfront Trail (Phase II) and the 36th Street Railroad <br /> Crossing Closure improvement projects. <br /> W03036&2598-Bid Call CCA.doc 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.