My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/07/08 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/07/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 11:40:41 AM
Creation date
4/7/2017 11:40:23 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/8/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Award of construction contract Consent COUNCIL BILL# <br /> for the Holly Drive Non- X Action Originating Department Engineering <br /> Motorized Improvement First Reading Contact Person 4.0 Ryan Sass, PE <br /> Project to T.E. Briggs Second Reading Phone Number (425) 257-8942 <br /> Construction Company, of Third Reading FOR AGENDA OF July 8, 2009 <br /> Edmonds, WA, in the amount Public Hearing <br /> of$698,000.00. Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Holly Dr. —4th to 92nd 4/15/09—Authorized call Bid Summary <br /> for bids <br /> Amount Budgeted $830,239.00 <br /> Expenditure Required $698,000.00 Account Number(s): PW3254 <br /> Budget Remaining - 0 - <br /> Additional Required - 0 - <br /> DETAILED SUMMARY STATEMENT: <br /> Bids were opened on June 16, 2009 for the Holly Drive Non-Motorized Improvement Project. This project will <br /> construct curbs, gutters, sidewalks, bike lanes and storm drainage improvements on Holly Drive from 92nd <br /> Street to 4th Avenue W. These improvements will enhance safety and mobility for non-motorized traffic <br /> in this corridor, as well as complete the missing link in the Holly Drive corridor. <br /> The source of funds for this project is: <br /> CMAQ (Federal) $431,278.00 <br /> ARRA (Federal Economic Stimulus) 199,413.00 <br /> Fund 119 (Arterial Streets) 67,309.00 <br /> Total $698,000.00 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize award of construction contract for the Holly Drive Non-Motorized Improvement Project to T.E. <br /> Briggs Construction Company, of Edmonds, WA, in the amount of$698,000.00. <br /> • <br /> wo3254 Award.doc 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.