My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/07/15 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/07/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 11:49:12 AM
Creation date
4/7/2017 11:48:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: WFP Clearwell No. 2 <br /> Change Order No.5 <br /> Effective June 23,2009 <br /> Exhibit A- Description of Changed Work <br /> Change Order#5 <br /> Create New"Bid Iran#8'L entitled,"Change Ord" 45", iifthe lump sum amount of-$64,315.77, <br /> which shall incorporate Work Change Directives 020,060, 061, 062 and 066 per the following: <br /> 1. Work Change Directive 020—Delete Finished Water Flow Meter Vault floor section and weep <br /> ring(Detail 4/1C-503) and reinforcing detail EM 070 GC-704. Decease contract by$1,290.00. <br /> 2. Work Change Directive 060—Install a storm drain pipe northwest of Clearwell No. 1. Increase <br /> Contract by$1,354.00. <br /> 3. Work Change Directive 061 —Delete roadway guardrails from the new road to be installed <br /> between Clearwell No. 1 and Clearwell No.2. Decrease Contract amount by $34,400.00. <br /> 4. Work Change Directive 062—Reimburse City of Everett for PUD charges that should have been <br /> paid by the Contractor. Decrease Contract amount by $ 48,964.00. <br /> 5. Work Change Directive 066—Correct settlement out-of-roundness and add a filler band so the <br /> existing 84-inch Filtered Water pipe and the new 84-inch Filtered Water pipe that have different <br /> outside diameters could be connected with butt straps. Increase the Contract by$18,984.23. <br /> JUSTIFICATION: <br /> 1. Work Change Directive 020—It was preferred by the City of Everett that the Finished Water <br /> Meter Vault be free-draining instead of having the concrete floor. The reinforcing was shown <br /> in the electrical duct only in the manhole detail and is not used anywhere else. <br /> 2. Work Change Directive 060-The added storm drain pipe was installed to prevent ponding of <br /> water in the new site grading. <br /> 3. Work Change Directive 061 —Guardrails included in the design are not used anywhere else on <br /> site and not desired by the City of Everett plant staff. <br /> 4. Work Change Directive 062 —The City of Everett was invoiced by PUD and inadvertently paid <br /> for work that should have been paid by the Contractor. The Work Change Directive 062 <br /> reimbursed the City. <br /> 5. Work Change Directive 066—The existing 84-inch Finished Water line between the Filters and <br /> the Clearwell Control Structure through the years had gone out-of-round by 5-inches.The <br /> existing 84-inch pipe and the new 84-inch pipe have different exterior diameters. This required <br /> that the existing pipe be slowly jacked into roundness and that a flat band be welded to the <br /> outside of the smaller diameter pipe to allow welding the butt strap connection between the two <br /> pipes. <br /> CONTRACT TIME: <br /> Contract time will not be changed by this Change Order. <br /> Page3of3 <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.