My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/07/29 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/07/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 8:16:41 AM
Creation date
4/10/2017 8:16:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/29/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Project: Replacement of Water Transmission r„_ <br /> Lines 2 and 3 Phase 6 Project. i <br /> Change Order No.2 <br /> Change Order Effective Date: June 8, 2009 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. In full and complete compensation for the changes described in Exhibit A, including all <br /> direct and indirect costs and impacts,the contract price shall be adjusted as described <br /> in this Change Order. <br /> 3. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 4. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation,delay,impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest,dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute claim, or contract Claim that ends <br /> after the date of this Change Order,but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice. <br /> 5. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> �'S `{, ',ya.' �? ka nth+ha r'h �2 <br /> � 5 � ��3�u��ZY �, � Kx,�L, �` ^e it '4r t N '�f• � ��.�Sc., 1 e1 y�$ya x�ty'i 3'�.v�he:Y _.�4 <br /> .A kµ4:l^' C' �" $ C .,.'� .s, : F?I,`4 V,V.5'�'v�7ye*—ZP?,��'^I t`�. x L t e' <br /> `�,! '.r w„�`�q '�by .�'.� 9. Z�}��`��zz b 'k *,y.3 s �' { ��k��,F^k,�s,. �?'FF� � ^ <br /> S "�. .+ ;�:. .'K,:� k` �''si-. `a_,°vim-wr + t ,.... .A�. <br /> Attest: Approved As to Form: <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> ,.1:. - lltdt% <br /> Date: N • <br /> Date: i j'( IVO) te:"7 it l Date: 07 <br /> Page2of4 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.