My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/07/29 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/07/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 8:16:41 AM
Creation date
4/10/2017 8:16:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/29/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR: KLB Construction ADDRESS: PO Box 158 <br /> CITY: Mukilteo STATE: WA 98275 DATE: June 23, 2009 <br /> PROJECT TITLE: Everett Riverfront Surcharge Shed. A& B WORK ORDER NO. 3310A&3316B <br /> DATE WORK COMPLETE: June 21, 2009 FINAL AMOUNT: $9,505,791.88 <br /> ---CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> understand the same and at I -reby release the City of Everett from any and all claims of whatsoever nature <br /> which I may have, arii;• of the performance of said contract, which are not set forth in said estimate. <br /> X G'� X Treasurer/CFO <br /> CONTRACTOR TITLE <br /> KLB Construction Notary Public <br /> Corey Christensen State of Washington <br /> DALYN M. RANDALL <br /> Subscribed and sworn,,.. before MY COMMISSION EXPIRES <br /> me this . •a •f O9 July 13,2011 <br /> • A IffAadar/_�'�// otary Public <br /> in and fo the tate of Washington, residing at(-11VP � e <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final APPROVED Date: 7-1(7-194/ <br /> estimate to be based upon actual <br /> measurements and to be true and correct. <br /> X X <br /> Construction Manager Utilities Director <br /> Tom Fuchs Tom Thetford <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 9/94 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.