My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/09/16 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/09/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 9:27:32 AM
Creation date
4/10/2017 9:26:48 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/16/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Licensee to implement the plan in lieu of the applicable proposed license article. For <br /> eiraitiple,with`respebfto the Marsh Creek Slide Plan,the'Licensee shall request that such <br /> plan replace[A-LA 2]. Upon Commission issuance of a Project License,the Licensee <br /> shall implement the plan. Any License Article that requires the Licensee to implement a <br /> plan developed prior to issuance of the Project License shall not be considered a <br /> Material Modification to the Settlement Agreement so long as the ARC achieved <br /> consensus on such plan. <br /> 2.5. In the event that the ARC cannot achieve consensus on a plan prior to issuance of the <br /> License,the Licensee shall file the plan within ninety(90)days after the issuance of the <br /> License,unless the License Article obligation is stayed or extended consistent with <br /> Settlement Agreement Section 4.7. The Licensee shall allow a minimum of thirty(30) <br /> days for the members of the ARC to comment and make recommendations before <br /> submitting a plan to the Commission. When filing a plan with the Commission,the <br /> Licensee shall include documentation of consultation;copies of comments and <br /> recommendations;and specific descriptions of how comments and recommendations <br /> from the ARC are accommodated by the Licensee's plan. If the•Licensee does not adopt <br /> a recommendation of an ARC member,the filing shall include the Licensee's reasons <br /> based upon Project-specific information. <br /> 3. Marsh Creek Slide <br /> 3.1. Within one year of the Effective Date of the Settlement Agreement,the Licensee shall <br /> (1)establish a permanent survey control point or benchmark at the Marsh Creek Slide <br /> and(2)conduct a detailed baseline physical survey at low flow. <br /> 3.2. The License shall consult with the ARC in undertaking the measures described in <br /> Section 3.1. <br /> • <br /> 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.