Laserfiche WebLink
Licensee to implement the plan in lieu of the applicable proposed license article. For <br /> eiraitiple,with`respebfto the Marsh Creek Slide Plan,the'Licensee shall request that such <br /> plan replace[A-LA 2]. Upon Commission issuance of a Project License,the Licensee <br /> shall implement the plan. Any License Article that requires the Licensee to implement a <br /> plan developed prior to issuance of the Project License shall not be considered a <br /> Material Modification to the Settlement Agreement so long as the ARC achieved <br /> consensus on such plan. <br /> 2.5. In the event that the ARC cannot achieve consensus on a plan prior to issuance of the <br /> License,the Licensee shall file the plan within ninety(90)days after the issuance of the <br /> License,unless the License Article obligation is stayed or extended consistent with <br /> Settlement Agreement Section 4.7. The Licensee shall allow a minimum of thirty(30) <br /> days for the members of the ARC to comment and make recommendations before <br /> submitting a plan to the Commission. When filing a plan with the Commission,the <br /> Licensee shall include documentation of consultation;copies of comments and <br /> recommendations;and specific descriptions of how comments and recommendations <br /> from the ARC are accommodated by the Licensee's plan. If the•Licensee does not adopt <br /> a recommendation of an ARC member,the filing shall include the Licensee's reasons <br /> based upon Project-specific information. <br /> 3. Marsh Creek Slide <br /> 3.1. Within one year of the Effective Date of the Settlement Agreement,the Licensee shall <br /> (1)establish a permanent survey control point or benchmark at the Marsh Creek Slide <br /> and(2)conduct a detailed baseline physical survey at low flow. <br /> 3.2. The License shall consult with the ARC in undertaking the measures described in <br /> Section 3.1. <br /> • <br /> 81 <br />