Laserfiche WebLink
9 <br /> fulfill any and all existing statutory,regulatory or contractual obligations of the City and the <br /> District relating to the Lake Chaplain Tract. <br /> 2.0 Management of the Lake Chaplain Tract and Other Tracts <br /> 2.1 Lake Chaplain Tract. This Agreement and all obligations herein pertain solely to <br /> the management of the Lake Chaplain Tract. The Lake Chaplain Tract, which is <br /> located 6 miles north of the town of Sultan,Washington, consists of a 441-acre <br /> reservoir and 2,198 acres in and adjacent to the City of Everett's Lake Chaplain <br /> Watershed (see Map 1). (The Project features loc.,ted within the Lake Chaplain <br /> . <br /> Tract boundary are delineated on Map 1 and =� reat' part of the Lake Chaplain <br /> Tract.) The Lake Chaplain Tract is owned �< a` City. Additional description of <br /> the Lake Chaplain Tract can be found in:.�� '44. .1 of the WHMP. Subject to <br /> illi, <br /> ` � includes a portion of the <br /> sections 4.1 and 4.3.2 below,in the eventllat ���� <br /> Lake Chaplain Tract in the Project x` dary, the 1:.:.1-.chaplain Tract shall <br /> 'Of <br /> include only those lands that wer' `included withiri :.=`:,£�roject boundary. <br /> 2.2 Lake Cha lain Tract Land Manu= i ._-nt Obli= ons. <br /> 2.2.1 Pursuant to t Stugreement,tl f : ees to manage the Chaplain <br /> Tract towards nng the man ' ;,ent objectives and habitat priorities <br /> of the WHMP a4ns% din WH '``action 1.2 and the WHMP annual <br /> gip. <br /> reports from 198 :;though: $ for 50 t� from the Effective Date. <br /> U. �, r expiration4of'50-yea ,e n the ;'. ,tive Date, this Agreement <br /> 4 x 9 '4 ti aticallyc ene ' ' i k equ=''t of any Party for a second <br /> ,f .-year to .,rovided'.Y L Parties`\�;_�'11 at that time identify the <br /> int;, sures to e,�!;implemei ti under the renewed Agreement. To that end, <br /> r <br /> the'' es t R s that tim ,eet and confer to identify such measures. <br /> Shou 4z;,o vi1 1 -a=ree*the measures to be implemented over the <br /> €ermof } ,_ ewed `�,A� ei�", the provisions of the WHMP, as modified <br /> antl4 to lei -1:',1S).-J1 and in i eon June 25, 2009, shall control. <br /> 2.2.2 The Ci .i ees .plement the WHMP sections and requirements of the <br /> WHMP-: .the City .''%tonablyipplicable to the Lake Chaplain Tract. Specifically, <br /> .l es that,to the extent applicable, the Lake Chaplain Tract will <br /> ;y <br /> "be mans s:>'m-;consistent with the WHMP habitat enhancement methods <br /> (rskq ):A`-ction 2.1—2.8),management tract prescriptions (WHMP <br /> Sect " .1), and monitoring program provisions (WHMP Sections 4.1 — <br /> 4.10),as modified in the WHMP annual reports from 1989 through 2008. <br /> The City further agrees that this management of the Lake Chaplain Tract <br /> will include creation of an appropriate number of snags and pre- <br /> commercial and commercial thinning on a site specific basis. <br /> 2.2.3 The City further agrees that the City will,within six months of the <br /> Effective Date,develop a Lake Chaplain Tract Wildlife Habitat <br /> Management Plan(LCT Plan). The LCT Plan will be developed in <br /> consultation with the other Parties. The LCT Plan will identify the harvest <br /> Lake Chaplain Tract Agreement,2009 -2- <br /> 8 7 <br />