Laserfiche WebLink
INSPECTION REPORT <br /> F, <br /> Date �''� Z l 1 Permit: no 00,5 <br /> Contractor: 1/,, • ' <br /> Owner: `` tA'� <br /> Site Address: A\L� Avg <br /> TYPE OF INSPECTION REQUESTED <br /> YCELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUEST D E]OK FOR C.O. E] VIOLATION �' QC <br /> NABLE TO PERFORM INSPECTION:'IC _ �CJ <br /> ALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> - 3 <br /> lam ` <br /> Inspector: _ Date: <br /> E I R(10/06) DATABAR,INC. <br />