Laserfiche WebLink
• <br /> PROJECT TITLE: 2 <br /> Amendment No.2 to the Consent COUNCIL BILL# <br /> Professional Services X Action Originating Department Public Works <br /> Agreement with Jones and First Reading Contact.Person Heather Griffin <br /> Stokes for the Smith Second Reading Phone Number ;K5)257-7206 <br /> Island/Unon Slough Third Reading FOR.AGENDA OF Oct.21,2009 <br /> Restoration Site Monitoring. Public Bearing <br /> Services Initialed by: <br /> Department Head <br /> CAA <br /> Council President A�:� 6! <br /> r.�� . <br /> Location Preceding ng Action Attachments Department(s)Approval <br /> Smith Island/Union 1,0/14/2009 Budget Committee Amendment No,2 Utilities <br /> Slough Map <br /> Amount Budgeted $60,000.00 <br /> Expenditure Required $25,000.00 <br /> Account Number(s):UP2969-4 <br /> Budget Remaining $3,909.00 • <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT; <br /> The City hps ajoint project with the US Army Corps of Engineers to restore 93 acres of intertidal wetlands <br /> east of the Water Pollution Control Facility on Smith Island. Three dike breaches were completed in . <br /> October 2007, allowing tidal Waters to enter the restoration site. Jones and Stokes provided the monitoring <br /> services for the.restoration site as required,during;the permitting of the project. Since the site was opened to <br /> tidal influence,there has been significant scouring of the bridge footings at the three dikes'breaches. <br /> Amendment No 2 provides for the.Alternatives Analysis and Cost estimate for Adaptive Management of <br /> Site Hydraulics and Public Access; <br /> • <br /> RECOMMENDATTON: <br /> Authorize the Mayor to signAmendmentNo.2 to the Professional Services Agreementwith Jones and <br /> Stokes for the Smith Island/Union Slough Restoration Site Monitoring Services in the sum of$25,000.00. <br />