2 <br /> photo,illustrating: 1)site location and 2 &3)one schematic illustration of the`recommended approach'for <br /> each of the two options. <br /> Task 6. Project Management <br /> This task allows time for the project manager to develop and maintain a project file,communication with <br /> EPWD, allows for communication between ICF Jones&Stokes and the structural and geotechnical engineers, <br /> as well as budget tracking,invoicing and preparation of progress reports. <br /> Unauthorized Additional Services <br /> At the specific authorization of EPWD,ICE Jones&Stokes will conduct specifically requested additional <br /> services,including but not limited to attendance at an agency meeting to support resolution of the bridge <br /> scour and hydraulic constraints identified during the year 1 monitoring. <br /> This task is intended to accomplish additional services requests without having to amend the contract multiple <br /> times, but ICF Jones&Stokes will track the level of effort(s) requested under this task and inform EPWD if <br /> funds in this task are insufficient to accomplish the requested work. This task will only be conducted if <br /> authorized in writing by EPWD. <br /> DELIVERABLE:. <br /> ICF Jones&Stokes will electronically deliver one PDF of the draft Alternatives Analysis memo and one CD and <br /> one hard copy of the final Alternatives Analysis memo, incorporating one round of consolidated client review <br /> edits into the final document. <br /> ASSUMPTIONS: <br /> ICF Jones&Stokes will not conduct a scour analysis or engineering analyses, as would likely be necessary for <br /> engineering design, but the estimated costs associated with these types of necessary analyses will be included <br /> in the memo. <br /> The alternatives analysis does not include design plans for any engineering solution analyzed,but rather <br /> comparative assessment of the potential costs,permitting implications,and potential consequences on the <br /> availability of mitigation area that may result from a long term fix versus trail rerouting/abandonment of the <br /> dike and bridges. <br /> The alternatives analysis will be conducted to a level of detail and precision commensurate with the budget <br /> ceiling established by EPWD, as illustrated in the attached cost estimate. This approach will thus be inherently <br /> somewhat qualitative and will rely on estimated costs to create the Summary of Quantities. <br /> Alternatives Analysis Scope,October 6,20097 Page 3 <br />