Laserfiche WebLink
-- .0 . .-._r ..._. .••,�:4... le;" <br /> „ ` , <br /> *It <br /> "44 <br /> ' w. .,� y� P ( 1 <br /> 3:: <br /> % <br /> � - - • 1 " �� yC <br /> 2 <br /> PROJECT TITLE: X Consent COUNCIL BILL# <br /> Call for bids for the Bond Action Originating Department Public Works <br /> Street Interceptor and Lift First Reading Contact Person Heather.Griffin <br /> Station 5 Force Main Second Reading Phone Number (425) 257-7206 <br /> Third Reading FOR AGENDA OF Nov. 9, 2009 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA sL <br /> Council President gel <br /> Locations Preceding Action Attachments Department(s)Approval <br /> Bond Street Map of Project Utilities <br /> 25th Street <br /> Amount Budgeted $2,250,000.00 <br /> Expenditure Required $1,000.00 Account Number(s): UP3407 and 3408 <br /> Budget Remaining $2,249,000.00 <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> As part of the National Pollution Discharge Elimination System(NPDES)Permit for the Water Pollution <br /> Control Facility,the City was required to complete the design of the controls for the four remaining <br /> uncontrolled combined sewer outfalls by December 2008. This requirement was met and the plans were <br /> approved by the Washington State Department of Ecology. The City is now proceeding to construct the <br /> necessary improvements. The Bond Street Interceptor and Lift Station 5 Force Main are two of five <br /> construction packages that are part of the needed improvements to the combined sewer overflow control <br /> facilities. <br /> RECOMMENDATION: <br /> Approve call for bids for both the Bond Street Interceptor and the Lift Station 5 Force Main. <br /> 3 <br />