Laserfiche WebLink
PUBLIC WORKS PERMIT Date: 13 <br /> Public Works Permit#: PW13PW1304-001 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Building Permit#; D1303-002 <br /> Everett, WA 98201 <br /> (425) 257-8810 Planning Reference#: <br /> Public Works Fee$: $ 360.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> GARNER KATHLEEN <br /> 1415 BROADWAY <br /> EVERETT WA 98201 <br /> PHONE: 4257540303 PHONE: <br /> TAX PARCEL ID# 00547428700600 SITE ADDRESS: 1411 BROADWAY AVE <br /> DESCRIPTION OF PROPOSED WORK: <br /> CONVERT LOT TO PKG LOT W/LANDSCAPING <br /> TO CREATE PARKING <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. INSTALL SITL FENCE PER CITY STANDADRS AND REMOVE UPON COMPLETION OF PRQJECT..,_, <br /> 5. NO DIRT, MUD, ROCKS OR DEBRIS TO BE TRACKED ONTO ROADWAY. `=1 <br /> 6. NEED SEPARATE PERMIT FOR THE RELOCATION OF THE SIGN. <br /> -r yy- ,s s+ <br /> 7. PARKING RUNOFF MUST FLOW ONTO THE EXISTING CAT F$ ''# 1. , c 9 1 <br /> 1-7J -_ <br /> 8. MAKE SURE THE UILITIES(SEWER,WATER)ARE CAPPED. <br /> 9. CONTRACTOR MUST CONTACT CITY OF EVERETT INSPECTOR-Ak ICY ALLEN 425-33�k� <br /> ,403 PRIOR TO <br /> STARTING CONSTRUCTION. ' <br /> �] I <br /> r t-i <br /> t I _?1 T1 1;•CY rJ� .,F•a a <br /> j co <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> or other right-of-way use hereto applied for and further agrees <br /> A pro for Co r c i n Dat to remove same upon notice from the City and to replace <br /> public property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed -Seignature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />