Laserfiche WebLink
required that what is shown on M0.0,then the adjustments shall be made during construction air balance. If the <br /> ventilation requirement is lower herein,that indicated on equipment schedule then the hlgher amount will prevail as <br /> indicated on the equipment schedule. <br /> SUMMARY Q <br /> The total air to space per equipment schedule Is shovm at 4�� CFM <br /> Total required by code FM <br /> Percent of total air= = % <br /> Comments: 0� <br /> Required ventilation per WSRC 2012 Is 7 or the amount of <br /> E'er as indlcated on the equipment schedule, <br /> 1 <br />