Laserfiche WebLink
(7) Authorize the Mayor to sign Amendment No. 2 to the Professional Services Agreement with <br />HWA GeoSciences, Inc. for Environmental Monitoring at the Everett Landfill to extend the <br />completion date to December 31, 2010 <br />(8) Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement with <br />HDR Engineering, Inc. for additional engineering services to provide wastewater operations <br />and compliance support in the amount of $144,300.00 <br />(9) Authorize the Mayor to sign Amendment No. 1 to the WashWise Program Agreement with <br />the Snohomish County Public Utility District in the amount of $60,000.00 <br />(10) Authorize the Mayor to sign Change Order No. 3 with Thomco Construction for the <br />Broadway at Beverly Boulevard Intersections Improvements Project in the amount of <br />$126,292.95 <br />(11) Authorize the Mayor to sign Interagency Agreement with Washington State Department of <br />Commerce and EEOP Certification regarding utilization of FFY 2009 STOP Formula Grant <br />Program funds in the amount of $31,176.00 <br />(12) CB 0911-40 — 3rd and final Reading - Adopt the Proposed Ordinance extending the effective <br />period for Preliminary Approval of Short Subdivision and Binding Site Plan applications <br />amending Ordinance 2530-01; <br />(13) CB 0911-41 — 3rd and final Reading — Adopt the Proposed Ordinance approving transfer of <br />control for the Franchisee (Verizon Northwest In.) from Verizon Communications Inc. to <br />Frontier Communications Corporation with conditions <br />PUBLIC HEARING: <br />(14) CB 0911-39 — 3rd and final Reading - Adopt the Proposed Ordinance adjusting water, sewer <br />and filtration rates, establishing special charges and fees and amending Ordinance No. <br />3096-08 (EMC 14.16.710 et seq. and EMC 14.04.020) <br />PROPOSED ORDINANCES: <br />(15) CB 0911-42 — 2"d Reading — Adopt the Proposed Ordinance creating a Special Improvement <br />Project entitled "City Center Safety Improvements," Fund 303, Program 085, to accumulate <br />all costs for the improvement project (3rd and final reading on 12-2-09) <br />(16) CB 091 4i1stReading — Adopt the Proposed Ordinance closing the Special Improvement <br />Project entitled 'Everett Riverfront Walkway Over Burlington Northern Santa Fe Rail Road <br />Tracks," fund 303, Program 070, as established by Ordinance No. 2774-04 (3rd and final <br />reading on 12-9-09) <br />