Laserfiche WebLink
INSPECTION REPORT <br /> Daiq� Permit: <br /> Contractor: <br /> ( Owner: <br /> Site Address: —53 , nU <br /> TYPE OF INSPECTION REQUE TED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/SlabEl oundwork/Slab <br /> ❑Groundwork ❑Footing [IRough In ugh In <br /> F]Slab/Conduit ElFoundation ElCeiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED F]❑ OK FOR C.O. F] VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: <jl�/ Date: —01 <br /> � <br /> EIR(4/09) 4Z;- G AE FORMS&PROMOTIONS•4-15/4811 8900 <br />