My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2805 COLBY AVE VALLEY ORGANIC DELI 2017-04-10
>
Address Records
>
COLBY AVE
>
2805
>
VALLEY ORGANIC DELI
>
2805 COLBY AVE VALLEY ORGANIC DELI 2017-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 2:14:27 PM
Creation date
4/10/2017 2:14:20 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2805
Tenant Name
VALLEY ORGANIC DELI
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/14/2017 Page 1 <br /> City of Everett <br /> 3:05:05PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1510-026 Site Address 2805 COLBY AVE <br /> Applied 10/19/2015 Applicant Lot <br /> Approved 10/29/2015 Owner SKOTDAL FAMILY INVESTMENTS LLC Block <br /> Issued 10/29/2015 Contractor OWNER Tract <br /> Parent Permit No. Description NEW STORE FRONT/TI-VALLEY ORGANIC DELI <br /> Notes INCLUDES HANDICAP BATHROOM SEPARATE PERMIT SUBMITTALS AND REVEIW <br /> REQUIRED FOR NEW COMMERCIAL KITCHEN <br /> Requested Scheduled Result <br /> Time/By Completed Inspection Type Inspector Remarks Notes <br /> 2/2/2016 2/1/2016 Footing DWF Need design from engineer for header <br /> 11:39 MEM Unable to inspect,see notes support and footing. <br /> 2/12/2016 2/12/2016 Framing DWF PartialApproval Kitchen walls,electrical room walls OK to <br /> 16:19 MTM 2/12/2016 See notes cover. <br /> Get kitchen permit before cover. <br /> Note:partial approval -bathroom ceiling <br /> need architect/engineer for ceiling-support <br /> water tank weight load? <br /> Also-entry walls-header approved by <br /> Steve Miller,OK to cover. <br /> 2/16/2016 2/16/2016 DrywallNailing TMB Approval <br /> 16:20 MTM 2/16/2016 <br /> 2/16/2016 2/16/2016 Framing TMB Approval <br /> 16:20 MTM 2/16/2016 Framing corrections OK <br /> 3/11/2016 3/11/2016 Final Bldg DWF Corr Reqd Install exit signagq front&back exits. <br /> 16:17 MTM 3/11/2016 See notes Need electrical sign off. <br /> 3/16/2016 3/15/2016 Final Bldg DWF Approval <br /> 08:32 MTM 3/15/2016 (Electrical signed off) <br /> 11/18/2016 11/18/2016 Mark Final** TKJ Approval <br /> 07:51 TKJ 11/18/2016 bldg final 3/15/2016 <br /> INSP_DETAILS CfiW <br />
The URL can be used to link to this page
Your browser does not support the video tag.